El artículo ha sido añadido
Written by a career construction professional, this text about scheduling andproject control addresses the average student, detailing all the steps clearly and without shortcuts. Solved and unsolved exercises cover all subjects, computer software programs for construction are included for each chapter, presents precedence networks as the realistic solution to scheduling, the main part of project control, and introduces new concepts in CPM scheduling such as the author's own Dynamic Minimum Lag technique.
- ISBN: 978-0-470-50533-5
- Editorial: John Wiley & Sons
- Encuadernacion: Cartoné
- Páginas: 480
- Fecha Publicación: 07/07/2010
- Nº Volúmenes: 1
- Idioma: Inglés