El artículo ha sido añadido

INDICE: Contents: Why conduct risk analysis?; Cost risk analysis: the basics; What is Monte Carlo analysis and how does it apply?; Collecting high quality data on cost risk methods and challenges; The correlations between common project element costs; Using risk register risks to drive the cost risk analysis; Preparing for integrated cost and schedule risk analysis; Essentials of integrated cost and schedule risk analysis; Integrated analysis method and case study basic results; Integrated cost and schedule risk analysis advanced results; Summary of integrated cost and schedule analysis; Index.
- ISBN: 978-0-566-09166-7
- Editorial: Gower
- Encuadernacion: Cartoné
- Páginas: 200
- Fecha Publicación: 01/06/2011
- Nº Volúmenes: 1
- Idioma: Inglés